Platform

Software that runs storage on the market

This is what Wesfin uses to run battery storage on Ukraine’s power markets: a DAM and IDM bidding optimiser, connection to the site EMS, a multi-site view and a public market-data API.

Markets
DAM, IDM
Equipment
REST · Modbus TCP · IEC 61850
Demo asset
Wesfin Demo
Size
5 MW / 20 MWh
Stage
Model on real prices

The demo battery is not connected to the grid. Prices on this page come from our API; the battery’s operation is computed by the optimiser and marked as a model.

Simulated model on real prices

Wesfin Demo: monitoring dashboard

A 5 MW / 20 MWh battery run by the Wesfin optimiser on real DAM prices: when to charge, when to discharge and what a day earns. The battery is modelled; the prices are real.

PrivatBank rates: €1 = UAH 49.65, $1 = UAH 45.10

Net result, 30 days

2.91UAHM

29 days with data

Plan for today

89.4UAHk

1 cycle(s), net margin

Price now

14,992UAH/MWh

DAM, hour 00:00 Kyiv time

Day peak / low

15,000/ 5 890 UAH/MWh

Delivery day 2026-11-22

Battery now

0.0MW

Waiting for a window · 15 % charged

Battery

5MW / 20 MWh

Reference CAPEX ≈ €3,6M

DAM prices and battery schedule · 2026-11-22

Fresh · for today
0500010k15k20k00:0003:0006:0009:0012:0015:0018:0021:00UAH/MWh
DAM priceChargeDischarge

Battery power

−6−4−202400:0002:0004:0006:0008:0010:0012:0014:0016:0018:0020:0022:00MW
Discharge (sell)Charge (buy)

State of charge

025507510000:0003:0006:0009:0012:0015:0018:0021:00%
State of charge, end of hour

Prices: Market Operator, via api.wesfin.energy, fetched 2026-11-21 17:59. The battery schedule is computed by the Wesfin optimiser; working charge band 15–85 %.

Dispatch cycles

1 cycle(s)

Day → Evening

the day's only profitable cycle

Charge (buy)

Window
11:00–14:00
Average power
4.68 MW
Volume
14.04 MWh
Average price
6,260 UAH/MWh
Cost incl. slippage
90.5 UAHk

Discharge (sell)

Window
17:00–21:00
Average power
3.21 MW
Volume
12.82 MWh
Average price
14,998 UAH/MWh
Revenue incl. slippage
186.5 UAHk
Spread
8,738 UAH/MWh
Round trip
91.3 %
Wear and fees
6,602 UAH
Net result
89.4 UAHk (99 % on charge cost)

History: daily net result

2026-10-24 — 2026-11-22

Total

2.91UAHM

Average per day

100.3UAHk

Days with data

29

of 30

Days without data

1

gaps in the price archive
05010015020024.1027.1030.1002.1105.1108.1111.1114.1117.1120.11UAHk

Each day is computed by the same optimiser on actual DAM prices (no forecast). Empty columns are days missing from the price archive.

Wesfin Demo is a model, not a working site: no 5 MW / 20 MWh battery is connected. Prices and FX are real; schedule and money come from the Wesfin optimiser, scaled from a 40 MW / 160 MWh unit with the same 4-hour ratio. Efficiency, wear, slippage and market fees are included; network charges, imbalance, tax and the Wesfin fee are not. Day-by-day comparison of as is and Wesfin Flex

DAM and IDM arbitrage optimiser

A battery charges when power is cheap and discharges when it is expensive. The gap can be large: on 14.04.2026 the DAM price ranged from 11 to 13,767 UAH/MWh within one day. The optimiser decides when a cycle actually pays.

Two cycle families

Night → Morning

Charge in low-price night hours, discharge into the morning peak.

Day → Evening

Charge at midday when solar output pushes prices down, discharge into the evening peak.

If the net spread is below the threshold, the battery waits. A loss-making cycle is not run.

A 36-hour planning horizon: DAM auction results and available IDM data give an hourly schedule that respects the site’s power, energy and limits.

What is taken off the spread

  • Round-trip efficiency

    Part of the energy is lost in each cycle; the optimiser counts what reaches the grid.

  • Degradation

    Each cycle carries a wear cost for the LFP cells, by depth of discharge.

  • Fees and slippage

    Market fees and the gap between the bid and the price actually achieved.

  • State-of-charge band

    Typically 15–85 %, to protect the battery and keep a margin for deviations.

Equipment and sites

The platform runs on top of existing equipment and grows with the number of sites.

  • EMS integration

    Connects to the site’s energy management system. An adapter layer translates protocols, so equipment on site stays as it is.

    RESTModbus TCPIEC 61850
  • Multiple sites

    From one container to several sites: one view, combined reports and figures for each site separately.

    OverviewReportsPer site
  • Reports and audit log

    Every bid and command goes into an audit log. Reports are produced as PDF.

    PDFAudit log

Market-data API

DAM prices are open to everyone without a key, with rate limits. Optimiser calculations and FX rates are open to partners with a key.

  • GET/api/dam/{delivery_date}Hourly DAM prices by datePublic
  • GET/api/dam/latestPrices of the latest DAM auctionPublic
  • GET/api/bess/optimize/latestLatest dispatch schedule calculationPartner key
  • GET/api/bess/revenue/latestDispatch result calculationPartner key
  • GET/api/fx/ratesFX rates, UAH/USD and UAH/EURPartner key

Who owns this today

The platform belongs to the group; separate Wesfin products sell and run it.

  • Wesfin FlexAggregator

    The group’s aggregator: customers’ storage, solar and flexible demand will reach the market through it. NEURC granted the aggregator licence on 13.10.2026.

    State
    Aggregator licence granted · commercial services not live yet
    For
    Owners of storage, solar and flexible demand
    Open site
  • Wesfin TechnologiesSoftware products

    Sells ERP, a virtual power plant (VPP) and market trading agents to other energy companies.

    State
    Products in use inside the group
    Site
    Open

Investment in the group’s storage is prepared by Wesfin Finance: investors page.

Price: an individual quote

There is no standard price list. We quote from the actual scope: size of the sites, integration and the features needed.

What is included

  • DAM and IDM bidding optimiser
  • Real-time operator dashboard
  • EMS adapter: REST, Modbus TCP, IEC 61850
  • API access with documentation
  • PDF reports and audit log

What changes the price

  • Number of sites and total power, MW
  • Integration complexity and equipment protocols
  • Number of dashboard users
  • SLA tier and support response time
  • Data retention and report frequency

Let’s talk about your site

We’ll show the platform on your data and scope the integration.